Thanks. I imagine that we keep on feeding info via this thread. The second design iteration, the third and final one, and then the build. The yard that'll build the ship will commit to the plan and the numbers. Usually, the contract states that a ship needs to get to a certain speed. For us the crucial number will be fuel consumption at 10 knots.
We are looking at two building slots, currently. One in January, the other in May 2022. The NA feels that January may be a stretch, since there is still a lot of drawings and schemes to be made.
We'll finish the first design iteration cycle in a week and a half from now. First thing after that is that price estimates will be made, based on the outcomes. That'll help us establish a feasibility study. The feasibility study will give us a formal yes/no decision moment on the project.
Regards, Edwin & Veronika.
We are looking at two building slots, currently. One in January, the other in May 2022. The NA feels that January may be a stretch, since there is still a lot of drawings and schemes to be made.
We'll finish the first design iteration cycle in a week and a half from now. First thing after that is that price estimates will be made, based on the outcomes. That'll help us establish a feasibility study. The feasibility study will give us a formal yes/no decision moment on the project.
Regards, Edwin & Veronika.