I have a lot to do. My boat is currently in heated storage where I can work on it. The only problem I have is that I am currently in phase three of rotator cuff surgery recovery. I have just under 5 months before the boat goes back in the water.
My boat is 45 years old, very solid except for some soft deck spots. The boat has not been updated for a long time and has had very little usage. I bought the boat with 1,310 hours on the engines with two previous owners and good records.
Steering: Remove the rudders and check for damage and corrosion, reinstall. Rebuild steering pumps, cylinders and replace all hydraulic lines.
Engines, replace all hoses and belts, service all accessories, rebuild synchronizers, boil out heat exchangers, remove rust and paint, rebuilt one raw water pump. Move racors, replace all rubber fuel lines.
Fuel system, replace all rubber fill hoses and repair fuel gauges.
Generator, rewire generator to auto start with the flip of a switch, remount wet muffler.
Stabilizers, remove fins and check for corrosion and rebuild if necessary, remove and rebuild all components, install dryer and after filter in system, figure out how to park them when off. Replace all air lines and service air compressors.
Air conditioning, AC pump looks vulnerable, redo and reroute, clean all evaporators and new drain hoses.
Power, go through all connections for corrosion and re-clamping broken or missing clamps. Figure out wiring and diagram. Go to LiFePO4 batteries.
Fire suppression, have system serviced.
Bilge, wash, and paint move and anchor trim ballast.
Sewage, replace all hoses and rebuild rear head.
Salon, build new dinette and repair rear wall. Refinish all teak throughout boat
Exterior, replace front windows and one side salon window, new window tracks, Fix spongy decks, two new Bimini tops, repair a couple of blisters, bottom paint, replace zincs, paint deck, repair teak table, install davits, new Ronca anchor, rebed all fittings, install new stair standoffs, redo, engine gauges, repair lights, new deck lights, refurbish mast and crane, polish hull.
Electronics, replace all electronics.
The above is a two-year project. Must prioritize for the next 5 months. Back in same heated storage for another winter then leave on loop and points beyond.
Launch late May
Summer trip will be from Sandusky Ohio back to roots in Traverse City and the North Channel for about 5 weeks. Lots of local boating as well. Approximately 1,200 -1,400 miles. About one tank of fuel.