It was announced recently in the local media here in Washington that Boeing is aquiring more land around its Charleston 787 production facility for expansion of that facility.
I assume all this means is that we are excercising the options we've had on the land around the facility for several years now. This area is sufficient to double if not triple the manufacturing and assembly capabilities that are there now.
I was just told by one of our cameramen who was there the other month that much of the huge employee parking lot adjacent to the new 787 assembly buidling is being ripped up, apparently in preparation for more building activity.
It certainly jibes with what we have heard are the long-range plans for the company's operations in that state.
I assume all this means is that we are excercising the options we've had on the land around the facility for several years now. This area is sufficient to double if not triple the manufacturing and assembly capabilities that are there now.
I was just told by one of our cameramen who was there the other month that much of the huge employee parking lot adjacent to the new 787 assembly buidling is being ripped up, apparently in preparation for more building activity.
It certainly jibes with what we have heard are the long-range plans for the company's operations in that state.
Last edited: